Timeline photos Timeline photos "The first 200-foot section of a…

 ·  Facebook — Archer T. Ships added 2 new photos.  ·  Markdown source

"The first 200-foot section of a modular dry dock, designed by JMS Naval Architects for Group Ocean of New Brunswick, Canada was launched on 18 September 2019. This center section of the modular dry dock was designed to be fully operational as a stand-alone dry dock with a lifting capacity of 3,800 tons. The dry dock was designed to be built in three phases. The first 200-foot long section was designed to be joined by two additional 120-foot long end sections at a later date to create a 420-foot long dry dock. The additional end sections will increase the lifting capacity to 7,500 tons."

https://www.jmsnet.com/2019/10/modular-dry-dock-launched/